Detailed engineering and geological survey for the installation of a turbocharger in high-pressure pipeline compressor stations. Drilling works carried out into semirocks.
2018
Detailed engineering and geological survey for the installation of a turbocharger in high-pressure pipeline compressor stations. Drilling works carried out into semirocks.
2018