Drilling 60 core holes to 17 m depth with total 402 m length as the supplementary geotechnical exploration for construction of local route interchange (“Týneček s I/46”).
Drilled core holes with 175/159/173 mm diameter has cased with string of 152 mm dianmeter.
09/2017 – 11/2017