Scope of work:
Drilling for engineering and geological, hydrogeological and remediation surveys
- Exploration core drilling- dry drilling with the use of a TK boring crown, and drilling fluid with the use of a double casing bit with a diamond crown
- Exploration hydrogeological drilling- core drilling with the use of a TK boring crown, and raise driving with the use of a rock drill, drill diameter 137 – 274 mm
- Monitoring wells for the purpose of inclinometer or soil pore measuring devices placement
Drilling for the primary circuit of a heat pump
- Heat pump boreholes of a depth up to 150 m
Construction Drilling
- Drilled wells with a minimum final drill diameter of 220 mm
- Boreholes for micro-piles and for rider bracing with a maximum diameter of 274 mm
- Boreholes for cable and/ or bar anchors
- Drainage wells for the purpose of underground water reduction in construction pits and trenches
- Degassing boreholes at municipal waste dumps